Services

ODM and OEM performance pants manufacturing

Bring a concept and we develop the pattern, or send a tech pack and we produce to your specification. Sampling takes 5–7 working days, bulk production 25–40 working days, and both services run through the same quality checkpoints.

ODM and OEM compared

Comparison of ODM development and OEM production services at Winking
DimensionODM developmentOEM production
Starting point Your concept, sketch, competitor sample or reference garment Your finished tech pack and size chart
Design responsibility Winking pattern team develops the style, spec and prototype Buyer supplies the specification and grading
Typical use Building a differentiated collection that competitors cannot source Reproducing a proven style with controlled quality
Pattern ownership Pattern can be licensed exclusively to your brand per market Pattern remains with the brand owner
Sampling Pattern development plus pre-production sample in 5–7 working days Pre-production sample in 5–7 working days
Order process

From inquiry to shipment in four stages

Stage 01

Inquiry and consultation

Share the category, target quantity, market and launch window. We confirm MOQ, fabric direction and indicative costing within one working day.

Stage 02

Design and sampling

Pattern development, fabric sourcing and a pre-production sample in 5 to 7 working days. One round of fit revision is included.

Stage 03

Production and QC

Bulk production in 25 to 40 working days with fabric inspection, in-line checks and a final inspection before packing.

Stage 04

Shipping and after-sales

Sea, air or express freight with export documentation, plus reorder support and programme expansion.

Customisation

What can be customised

The options below are confirmed on the pre-production sample, because each one changes construction time and unit cost. Anything not listed can be discussed with the category specialist handling your programme.

Customisation options available for Winking performance pants orders
Brand marks Logo embroidery, heat transfer printing, printed and woven labels, branded hangtags
Construction Articulated knees, gussets, reinforced stress points, seam sealing, bonded panels
Functional details Reflective taping, multi-pocket assemblies, ventilation openings, adjustable waist systems
Fabrics Waterproof, windproof, quick-dry, moisture-wicking, anti-UV, fleece-back and recycled options
Fit Custom size charts, grading rules and fit blocks for the target market
Packaging Printed poly bags, branded cartons, retail outer boxes and barcode labelling
Start a project

Ready to build a collection your customers will reorder?

Send us your tech pack or your idea. Tell us the category, target quantity and launch window, and we reply with pattern options, fabric recommendations and a costing sheet within one working day.

  • 51 proprietary patterns, ready to adapt to your fit
  • MOQ 100 pcs per style per colour on stock fabric
  • Samples in 5–7 working days, bulk in 25–40 working days
  • One English-speaking merchandiser per project
Request a quote WhatsApp us
Scroll